Jobs & Issues

The following is a list of pending jobs and other issues that have been noted in the Breckland and Waveney Valley area. More serious issues are also shown on the Group Area Issues Map. There are also a separate maps showing barriers to cycling within Thetford, and possibilities for new NCN routes in the area.

Route 13 and 30 Thetford

  • Decide on the optimal places for some destination text to be added to existing signs, and order the signs.

Route 13 Thetford to Stonebridge

No known issues

Route 13 Stonebridge to Daffy Green via Watton

  • Track surface along Peddars Way is poor. Many potholes could do with filling in with gravel.
  • Minor root/weed surface damage on Stans Walk, needs to be kept under review.

Route 13 Daffy Green to Gateley via Dereham

No known issues

Route 30 Croxton to Weeting via Brandon

  • See if there is some way to add some confirmation signs along the metalled part of Harling Drove Road, somewhere around the Croxton–Lynford parish boundary.
  • Find a suitable place to make use of the pair of permanent metal signs removed from the old course of route 30.

Route 30 Weeting to Ten-Mile Bank via Feltwell

  • Off-road section north of Southery has poor surfaces and is overgrown in places. Further investigation needed.
  • The surface of the shared-use cycle path alongside A10 is breaking up, with weeds growing though. Uneven surface may be dangerous.

Route 30 and 13 Thetford to Knettishall

  • More confirmation signs needed along the route.

Route 30 Knettishall to Diss

  • More confirmation signs needed along the route.
  • Cycle links to Diss station need to be agreed and then signed.

Route 30 Diss to Harleston

  • There seem to be several different routes signed in and around Harlstone, particularly heading north towards Bungay. The official routes need to be confirmed, and the signing tidied up accordingly.